Items we have implemented:
1.Build smoke channel fire bricks and chimney base
2. Build the furnace, pour heat-resistant concrete on the furnace walls and hydraulic beams
3. Pour heat-resistant concrete and insulate the chimney
4. Install the chimney
5. Install air lines, water lines, and heating oil lines
6. Instructions for drying and operating the furnace.